Home button
Site map button
Assessibility logo
Email button
FAQ button
Font Size
Small font
Medium font
Large font
816 969-1800
TransportationTabs
HighlightsContact UsConnect With Us...

Save the Date

The City's popular Big Truck & Equipment Show is from 10 a.m. - 2 p.m. on Saturday, May 20, 2017, on Green Street in front of City Hall. Kids of all ages can climb into the driver's seat of some of the City's biggest pieces of equipment!

Report a Pothole

To report a pothole in a City street, notify the Public Works Department by calling (816) 969-1800 or include the street name and direction of travel in our contact us form. The pothole will be repaired within one working day (24 hours), weather permitting

Get Involved by Adopting a Street!

The Adopt-A-Street Program recognizes the commitment of volunteers to keep our City's roadways free from litter and debris. Read more...

Road Closures

Click here to be directed to the City's road closure webpage for updates on street closures due to road construction and repair. The City makes every effort to complete the necessary work as quickly as possible. We appreciate your patience and hope you enjoy the improvements. For state road closures, please visit MoDOT Work Zone.

Public Works News

Work Set to Begin on Route 291 South/US Hwy 50 Interchange Project; MoDOT Announces Closures

The Missouri Department of Transportation (MoDOT) has announced closures impacting the Route 291 south and U.S. Highway 50 Interchange. The work is necessary for the Route 291 south/U.S. Highway 50 Interchange project, which is set to begin May 3.

Lee’s Summit Road Improvements Project Wins Project of the Year Award from APWA KC Metro Chapter

The Lee’s Summit Road Improvements Project was announced as a Public Works Project of the Year by the Kansas City Metro Chapter of the American Public Works Association (APWA) at a luncheon on April 12, at the Grand Street Café in Kansas City, Mo. The project won in the transportation category for projects more than $5 million but less than $25 million. The entire project team, including the City of Lee’s Summit, the City of Kansas City, Mo, engineering consultant TranSystems, and contractor VF Anderson Builders, were recognized for the award.

5th Terrace Improvement Project Open House Set for April 10

The City of Lee’s Summit will host an open house for the 5th Terrace Improvement Project from 5:30-7:30 p.m. on Monday, April 10, at Lee’s Summit City Hall, 220 S.E. Green St., in the Howard Conference Room on the second floor.

Temporary Runway Closures at Lee’s Summit Municipal Airport Set to Begin

**UPDATE 4/17/17**
Runway 11/29 will temporarily close for 21 days beginning at 8 p.m. on Monday, April 17. During this period, both runways will be closed and no take offs or landings are possible. After this period, runway 11/29 will reopen; however, runway 18/36 will remain closed until construction is completed in four to five months. Please note the Airport will be open to helicopter operations during the closure of both runways.

**UPDATE 4/10/17**
Please be advised that due to the weather forecast in the coming days, the closure of Runway 11/29 will be pushed back to the week of April 17th.  An exact date for the closure will be posted once it has been determined.

**UPDATE 4/7/17**
The closure of Runway 11/29 will begin at 8 p.m. on Monday, April 10, weather permitting. This runway will remain closed for approximately 21 days. Please note that during those 21 days, no take offs or landings are possible at the Airport. If weather conditions prevent the start of this work as planned, the NOTAM will be cancelled no later than 5 p.m. local time on Monday afternoon.

**UPDATE**
The planned closure of Runway 18/36 beginning Monday, April 3, has been postponed due to weather conditions. The next possible date for the work to begin will be Thursday, April 6. A Notice to Airmen (NOTAM) will be filed the evening of April 4, if weather conditions permit.

Runway 18/36 at the Lee’s Summit Municipal Airport is set to close temporarily at 7 a.m. on Monday, April 3, weather permitting, and will remain closed for approximately four to five months. In addition, runway 11/29 is set to temporarily close at 8 p.m. on Wednesday, April 12, weather permitting, and will remain closed for 21 days for runway intersection construction. 

No take offs or landings will be possible during the 21 day closure of both runway 18/36 and 11/29. After those 21 days, runway 11/29 will re-open while runway 18/36 will remain closed until construction is completed. These runway closures are necessary as part of the runway 18/36 improvements project, which will extend the runway from 4,000 to 5,500 feet.
Page 1 of 24First   Previous   [1]  2  3  4  5  6  7  8  9  10  Next   Last