| Airport |
Modular Units Rental Rates ($1.71 per sf per month, $20.52 per sf annually)
Office-A: 121 sf $206.91 per month, $2,482.92 annually
Office-B: 121 sf $206.91 per month, $2,482.92 annually
Office-C: 154 sf $263.34 per month, $3,160.08 annually
Office-D: 205 sf $350.55 per month, $4,206.60 annually
Office-E: 152 sf $259.92 per month, $3,119.04 annually
Office-F: 49 sf $83.79 per month, $1,005.48 annually
Office-G: 294 sf $490.98 per month, $5,891.76 annually |
Tows
Single: $12 per operation
Single with purchase of fuel at time of tow: $9.00 with purchase of 12-gallons of fuel or more
Twin Piston Engine: $15 per operation
Twin Piston with purchase of fuel at time of tow: $11.00 with purchase of 25-gallons of fuel or more
Any aircraft over 10,000 pounds: $20 per operation
Any aircraft over 10,000 pounds with fuel purchase: $17 with purchase of 60-gallons of fuel or more |
| Fuel Card Replacement |
$10.00 |
|
| Hangar Key replacement |
$20.00/ each |
|
| Hangar Rental Fees (rounded to the nearest dollar) |
|
| F-Building, Electric doors |
$579/ month |
| 53.5' x 48' "T" |
|
| (A) End Units Stores Rooms, |
$130 month |
| 340' Extra Space |
|
| G-Building, Electric Doors, |
$359 month |
| 41.5' x 33' "T" |
|
| (A) End Unit Store Rooms |
$116 month |
| 375' Extra Space |
|
| H-Building, Electric Doors |
$359 month |
| 41.5' x 33' "T" |
|
| (A) End Units Store Room |
$116 month |
| 375' Extra Space |
|
| P-Building electric doors |
$1,700 month |
| 60' x 60' "T" |
|
| Extra Jumbo Electric doors |
$514 month |
| 52' x 50' "T" |
|
| (A) End Units, 320' Extra space |
$576 month |
| Jumbo Electric Doors |
|
| 50' x 40' "T" |
|
| (A) End Units, 250' Extra Space |
$447 month |
| Middle, Electric doors, |
$354 month |
| 41' x 34 |
|
| (A) End Units, 160' Extra space |
$374 month |
| North, Electric Doors |
$310 month |
| 41' x 32' "T" |
|
| (A) End Units, 320' Extra space |
$373 month |
| North, Electric Doors |
$333 month |
| 42' x 33' "T" |
|
| (A) End Units, 160' Extra space |
$350 month |
| (B) End Units, 320' Extra space |
$403 month |
| Kingsize, Electric Doors |
$301 month |
| 40' x 29' "T" |
|
| (A) End Units, 160' Extra space |
$325 month |
| End Units, 320' Extra space |
$366 month |
| Large, Sliding doors |
$258 month |
| 40' x 32' "T" |
|
| Small, Sliding doors |
$207 month |
| 38' x 27' "T" |
|
| Open "T" |
$104 month |
|
| Monthly Electrical Fees |
|
| Air Compressor |
$7.00/ month |
| Fan |
$1.50/ month |
| Heater Portable |
$15.00/ month |
| Refrigerator |
$12.00/ month |
| Flourescent Light Fixture |
$3.50/ month |
|
| Overnight Tie-Down Fees |
|
| Single Piston Engine under 2,000 pounds |
$8.00 per night* |
| *first night fee waived if 10 gallons fuel is purchased |
|
| Single Piston Engine over 2,000 pounds (under 3,500) |
$12.00 per night* |
| *first night fee waived if 12 gallons fuel is purchased |
|
| Twin Piston Engine |
$20.00 per night* |
| *first night fee waived if 25 gallons fuel is purchased |
|
| Turbine Engine |
$30.00 per night* |
| *first night fee waived if 35 gallons fuel is purchased |
|
| Jet Aircraft |
$50.00 per night* |
| *first night fee waived if 55 gallons fuel is purchased |
|
| Recip-Helicopter |
$15.00 per night* |
| *first night fee waived if 15 gallons fuel is purchased |
|
| Turbine-Helicopter |
$25.00 per night* |
| *first night fee waived if 35 gallons fuel is purchased |
|
| F.B.O.s |
50% of full price |
| |
|
|
| Power Starts |
|
| Fox Cart |
$30.00 |
| Lektro |
$30.00 |
|
| Preheats |
|
| Single Piston Engine |
$30.00 |
| Twin Piston Engine |
$35.00 |
|
| Ramp Service Fees for Transient Aircraft |
|
| After 60-minutes |
|
| Single Piston Engine under 2,000 pounds |
$8.00 or 10 gallon fuel purchase |
| Single Piston Engine over 2,000 pounds (under 3,500) |
$12.00 or 12 gallon fuel purchase |
| Single Piston Engine over 3,500 pounds |
$15.00 or 15 gallon fuel purchase |
| Twin Piston Engine |
$25.00 or 25 gallon fuel purchase |
| Turbine Engine |
$35.00 or 35 gallon fuel purchase |
| Jet Aircraft |
$55.00 or 55 gallon fuel purchase |
| Recip-Helicopter |
$15.00 or 15 gallon fuel purchase |
| Turbine-Helicopter |
$30.00 or 30 gallon fuel purchase |
|
|
| Rent-A-Car comission Fee |
$3.00/ car |
|
| Self-Servicing Fuel system |
$0.18/ gallon discount |
|
| Transient Overnight Hanger Fees |
|
| Open-T |
$25.00 |
| Enclosed Units (G, H, K, M & N) |
$45.00 |
| Enclosed Units (S & L) |
$38.00 |
| Enclosed Units (J & XJ) |
$60.00 |
| Enclosed Units (F) |
$75.00 |
| Enclosed Units (P) |
$95.00 |
|
|
| Animal Control Fees |
| Administrative Fee- Spay-Neuter under Section 5-137 |
$50.00 |
|
| Breeder Permit |
$350.00 per breeder |
| Litter Permit |
$20.00 per litter |
| Hobby-Kennel or Hobby-Cattery Avocation Permit |
$40.00 |
|
| Deceased Animal disposal fee |
$12.50/ animal |
|
| Dog & Cat License |
|
| Spayed or Neutered |
$10.00 |
| Unaltered - 1st year of life |
$10.00 |
| Unaltered - 2nd or subsequent year of life |
$45.00 |
| Lifetime license - Spayed or neutered dogs & cats only |
$50.00 |
| *Penalty after May 1st |
$1.00 |
| **Replacement tag |
$1.00 |
|
| Impoundment - Dog & Cat |
$20.00 |
| Daily Feeding Fee |
$10.00 / day |
|
| Impoundment of any animal - other than a dog or cat: |
|
| Large animals |
$25.00 |
| Small animals |
$10.00 |
| Daily Feeding fee |
|
| Large animals |
$8.00/ day |
| Small animals |
$5.00/ day |
|
| Micro-chipping |
$15.00 |
| Adoption Fees: |
|
| female cats |
$60.00 |
| male cats |
$60.00 |
| male dogs |
$80.00 |
| female dogs |
$80.00 |
|
| Cemetery |
Cremation Grave Space $500.00 |
Grave Space $1,000.00 |
Weekday Grave Opening $800.00 |
Weekend/Holiday Grave Opening $800.00
Double Deep Grave Opening (first opening) $50.00
Weekday Infant Grave Opening $300.00
Weekend/Holiday Infant Grave Opening $320.00
Weekday Flagging Fee $50.00
Weekend/Holiday Flagging Fee $75.00 |
|
Columbarium Niche
Columbarium Niche 104 Serpentine
Columbaruum Double Niche
|
$1,150.00
$2,000.00
$4,000.00
|
|
| Cremation Opening |
$300.00 |
|
| Double Deep Grave Opening (first opening added to grave opening charge) |
$50.00 |
|
| Geneaology research |
$27.50/ hour |
|
| Monument foundations, footings adult (minimum $115.20) |
$0.40/ square inch |
Monument foundations, footings infant (smaller than 2') $50.00
Portable Engraving (Full Panel) $185.00
Portable Engraving (V cut death dates) $95.00
Scatter Garden Cremation Dispersal $300.00 |
| Portable Engravings Family Name on Back |
$210.00 |
|
| Portable engravings- Raised square letters |
$12.00 each |
|
| Purchase of unused grave (by City) |
$75.00 |
|
| Tree and shrub planting |
$27.50/ hour |
Tree and shrub removal $5.00 per cubic yard |
| Codes Administration |
| Commercial Activities |
|
| Addition to Commercial |
0.3498% of project construction valuation |
| Alteration to Commercial |
0.3299% of project construction valuation |
| Addition/Alteration to Multi-family |
0.3691% of project construction valuation |
| Change of Tenant |
0.4085% of project construction valuation |
| New Commercial |
0.361% of project construction valuation |
| New Multi-Family |
0.4932% of project construction valuation |
| New Commercial Shell Building |
0.3499% of project construction valuation |
| New Tenant Finish |
0.4396% of project construction valuation |
| Partial Commercial |
0.3196% of project construction valuation |
|
| Miscellaneous Activities and Other Fees |
|
| Addition/Alteration to other |
0.1364% of project construction valuation |
| Move |
0.4615% of project construction valuation |
| New other |
0.4508% of project construction valuation |
| Repair/replace/upgrade |
0.6841% of project construction valuation |
| Demolition permit |
$ 30.00 |
| Minimum permit fee |
$ 30.00 |
| Board of Appeals |
$ 150.00 |
| 3rd and subsequent inspections |
$ 30.00 / hour |
| After hours inspections |
$ 45.03 / hour |
| Sidewalk Deposits |
$ 10.00 / linear foot |
| Code Abatement Services |
Actual cost(s) for contracted service(s) + $100.00 Administrative charge & $24.00 filing fee |
|
| Residential Activities |
|
| Addition/Alteration 3 or 4 family |
0.3289% of project construction valuation |
| Addition/Alteration Duplex |
0.3422% of project construction valuation |
| Addition/Alteration Single family |
0.3837% of project construction valuation |
| New 3 or 4 family |
0.3385% of project construction valuation |
| New Duplex |
0.33% of project construction valuation |
| New Single family |
0.3092% of project construction valuation |
| Partial Residential |
0.2879% of project construction valuation |
|
| Court |
| Credit Card convenience fee |
$4.00 |
|
| Fire Department |
| Advanced Life Support 1 |
$375 resident
$500 non-resident |
|
| Advanced Life Support 2 |
$430 resident
$560 non-resident |
|
| Basic Life Support (non-life threat) |
$325 resident
$460 non-resident |
|
| Inner City Hospital to Hospital Transfer |
$300.00 |
| Lee's Summit Medical Center |
|
| Summit Ridge campus |
|
| St. Luke's East |
|
| Truman Medical Center- Lakewood |
|
|
| Mileage |
$7 /mile - resident
$7 /mile - non-resident |
|
| Standby Emergency Equipment |
|
| Ambulance |
$150.00/ hour |
| Fire Truck |
$250.00/ hour |
|
| Landfill Fees |
|
Trash Fees:
|
|
By the cubic yard
|
$11.36/cubic yard
|
|
By the ton (1 ton vehicles & larger), See Note*
|
$34.08/ ton
|
|
Appliances (washer, dryer, stove, etc)
|
|
|
$15.00/ each
|
|
|
|
|
|
|
Brush
|
|
|
non-resident & commercial
|
$13.75/ cu yd
|
|
resident (from the individual's residence)
|
$5.25/ cu yd
|
|
|
Yard Waste
|
|
|
resident bag
|
$0.75
|
|
non-resident bag
|
$1.50
|
|
non-residential & commercial
|
$8.93/ cu yd
|
|
resident (from the individual's residence)
|
$4.05/ cu yd
|
|
Christmas Trees
|
$1.00
|
|
|
Clean Wood
|
|
|
non-residential & commercial
|
$15.00/ ton or $7.50/ cu yd
|
|
|
Compost
|
$8.00/ 1/2 cu yd
|
|
|
$2.00/ bag
|
|
|
Concrete (includes brick & block)
|
$3.00/ cu yard
|
|
|
Household Hazardous Waste
|
|
|
Lee's Summit residents and MARC SWMD participants
|
No fee, by appointment only
|
|
non-participants
|
$50.00/ load
|
|
|
Plain mulch (from trees)
|
$3.00/cu yd
|
|
Stained and Unstained Mulch (clean wood)
|
$8.00/ 1/2 cu yd
|
|
|
|
|
|
|
|
|
|
|
Tires
|
|
|
passenger vehicles
|
$7.50/ tire
|
|
large truck
|
$10.75/ tire
|
|
|
|
|
*Note: Users who deposit at least 676 tons of acceptable solid waste in a given month are eligible for a ten percent (10%) discount on the monthly tipping fee for that month. Users who
deposit at least 1200 tons of acceptable solid waste in a given month are eligible for a twelve percent (12%) discount on the monthly tipping fee for that month; provided, however, that no
user may deposit any more than 2000 tons of solid waste in any given month, unless the average daily tonnage is equal or below 350 tons per day.
|
Banned Item hidden in Load: $10 per item + initial fee
|
Uncovered/Unsecured loads for brush & trash
|
surcharge of $15.00 in addition to applicable fees
|
|
|
|
|
| Maps and GIS |
| Pre-printed Map |
|
| CD-ROM |
$15.00 |
| Hardcopy (Plotter - B&W or color) |
|
| 8.5 x 11 |
$5.50 |
| 11 x 17 |
$6.10 |
| 17 x 22 |
$7.25 |
| 22 x 34 |
$9.50 |
| 33 x 44 |
$14.00 |
|
| Custom map* |
|
| CD-ROM |
$25.00 |
| Hardcopy (Plotter - B&W or Color) |
|
| 8.5 x 11 |
$10.50 |
| 11 x 17 |
$11.10 |
| 17 x 22 |
$12.25 |
| 22 x 34 |
$14.50 |
| 33 x 44 |
$19.00 |
| Custom size (36 x 48-60) |
$20.00 |
| *Fee includes $10 for labor. Additional time required will be billed at $20/ hour in 30 minute increments. Additional maps will be at base price (less labor). |
|
| Miscellaneous |
Fees for Special Events (as defined in the UDO Article 11)
- Application Fee $50
- Fee for City services for special event of one (1) day or less $250
- Fee for City services for special event of two (2) days $500
- Fee for City services for special event of three (3) or more days $1,500
- Fee for City services for 5K run on established route (maps of established routes are available from the Police Department)
- Route 1 (downtown area) $1,000
- Route 2 (Ward Road area) $400
- Route 3 (Legacy Park & Blackwell area) $500
- Route 4 (Jefferson Street and Stuart Road area $600
- Fee for City Services for athletic events, on a route approved by City Council or City staff (not on a pre-established route for 5K runs): actual cost of service, with estimated amount, determined by City staff, to be paid prior to the event, and the difference to be reimbursed by the City or paid by the applicant following the event
|
| Access and Search Fee |
$25.00/ hour |
|
| Application Fees: |
|
| Cable Franchise processing fee |
$5,000 + $200/ 1000 population |
| |
Maximum $20,000 |
| Telecommunications services ROW |
$2,000 + $100/ 1000 population |
| use agreement processing fee |
Maximum $5,000 |
|
| Business Licenses |
|
| Non Manufacturing Business License |
$30 + $5 for each employee |
| Manufacturing Business license |
$26 + $1 for each employee |
| Cigarette Sales |
$5.00 |
| Contractor License Fee |
$25.00 |
| Massage Therapy |
|
| Massage Facilities |
$100.00 |
| Therapist |
$30.00 |
| Penalty on Business License |
25%/ month delinquent |
|
| Code of Ordinances (paper copy) |
$165.00 |
|
| Fireworks Sales Permit Fee |
$275.00 |
|
|
| Penalty on Pet License |
$1.00 |
|
| Photocopies |
$0.10/ page + any applicable access & search fee |
|
| Planning and Development |
| Sign Application for Planning Commission action |
$200 |
| |
| |
|
|
| Commercial Rezoning and Preliminary Development Plan |
|
Commercial Rezoning and Preliminary Development
Plan - 0-5 acres |
$2800.00 + two legal notice publishing charge |
Commercial Rezoning and Preliminary Development Plan
- over 5 acres |
$3600.00 + two legal notice publishing charge |
| Commercial Preliminary Development Plan - 0-5 acres |
$1800.00 + two legal notice publishing charge |
| Commercial Preliminary Development Plan - over 5 acres |
$2400.00 + two legal notice publishing charge |
|
| Comprehensive Plan and Other Plan Documents |
| Comprehensive Plan Book |
$25.00 |
| Comprehensive Plan on CD-ROM |
$15.00 |
| Colored Comprehensive Plan Map only |
based on size-see GIS fees under "Miscellaneous" |
| Comprehensive Plan Book including all appendices |
$120.00 |
| Downtown Master Plan |
$25.00 |
| M-150/M-291 Corridor Plan |
$25.00 |
|
| Final Development Plan (Residential or Commercial) |
|
| Staff Review FDP 0-5 acres |
$600.00 |
| Staff Review FDP over 5 acres |
$1,000.00 |
|
Legal notice publishing charge (required for
all Public Hearing applications) |
$165.00 per legal notice publishing charge |
|
| Maps |
|
| Maps using Engineering Copier - 24x36" |
$5.00 |
| Maps using Engineering Copier - 36x48" or larger |
$10.00 |
| Maps from GIS using plotter |
based on size-see GIS fees |
|
| Miscellaneous Plans and Studies |
|
| Historic Preservation Plan |
$20.00 |
| Cultural Resources Study |
$20.00 |
| Downtown Market Study |
$10.00 |
| Downtown Traffic and Parking Study |
$20.00 |
|
| Residential Rezoning & Preliminary Development Plan |
|
| Rezoning with no PDP (AG, RDR & R-1 only) |
$700.00 + two legal notice publishing charge |
Residential Rezoning and Preliminary
Development Plan - 0-5 acres |
$2400.00 + two legal notice publishing charge |
Residential Rezoning and Preliminary Development Plan -
over 5 acres |
$3000.00 + two legal notice publishing charge |
| Residential Preliminary Development Plan - 0-5 acres |
$1600.00 + two legal notice publishing charge |
| Residential Preliminary Development Plan - over 5 acres |
$2000.00 + two legal notice publishing charge |
|
| Sign Permits |
|
| Sign Permit - permanent signs |
$100.00 |
| Sign Permit - electric |
$100.00 + Minumum Permit Fee (See Codes Administration fees) |
| Sign Permit - temporary |
$50.00 |
| Sign Permit - incidental signs |
$50.00 |
|
| Subdivision Plats (Residential or Commercial) |
|
| Preliminary Plat |
$700.00 + $ 3.00 per lot |
| Minor Plat |
$600.00 |
| Final Plat |
$700.00 + $3.00 per lot |
|
| Unified Development Ord. (UDO) |
|
| Paper |
$20.00 |
| CD ROM |
$10.00 |
|
| Banners on streetlight poles |
$50 application fee |
|
| Special Use Permit - In-Home Renewals only |
$300.00 + legal notice publishing charge |
|
| Special Use Permit (Residential or Commercial) |
$900.00 + legal notice publishing charge |
|
| Street Name Change Application |
$100.00 + legal notice publishing charge |
|
| Vacation of Right-of-Way |
$100.00 + legal notice publishing charge |
|
| Vacation of Utility Easement |
$100.00 |
|
| Zoning Approval Form for Business license |
no charge |
|
| Zoning Confirmation letter |
$100.00 |
|
| Zoning Variance (Board of Adjustments) |
$300.00 + legal notice publishing charge |
|
| Police |
| Alarm |
$25.00 One-time Registration Fee |
| |
$10.00 Yearly Renewal Fee |
|
| Audio Cassette |
$14.00/ hour + $1 material charge |
|
| CD for Audio reproduction |
$16.00/ hour + $1 material charge |
|
| CD for Digital Photographs |
$16.00/ hour + $1 material charge |
|
| Fingerprints |
$5.00/ 3 cards resident |
| |
$10.00/ 3 cards non-resident |
|
| Hourly services |
$30/ hr +$10/hr if police vehicle is used |
|
|
| Records Fees |
|
| Initial Report Copy |
$4.00 |
| Microfilmed Copies |
$8.00 |
| Criminal History Checks |
$5.00 |
| Certifies Reports |
$10.00 |
| Letters for Adoption |
$10.00 |
|
| Security Registration |
$20.00 first time |
| |
$10.00 renewal |
|
|
| Special Detail Services |
$35.50 per hour |
|
| VHS, 8mm Video Tape, DVD (Except Dash Cam) |
$16.00/ hour + $1 material charge |
|
| Video (Crime Scene, Traffic Crash, or Dash Cam) |
$50.00 |
|
|
| Public Works |
| Temporary Traffic Control Permit |
No charge. Permit is required for temporary traffic control. |
|
| After hours inspections |
$47.22/ hour |
|
| Blasting Permit |
$150.00 per blasting application |
|
| Decorative Sign Post |
Where an existing pole is being replaced that meets the current standards, the fee is 100% total material and labor cost (est. $130.00) Where an existing pole is being replaced that does not meet current standards, the fee is the cost difference between the standard pole and decorative pole (est. $35.00) |
|
| Design and Construction Manual |
$50.00 per hard copy |
| |
$5.00 per CD |
|
| Engineering Plan Review and Inspection Fee |
3% of project construction valuation |
|
| Grading (Land Disturbance) Permit |
0-1 acres - $200 |
| |
>1-3 acres - $400 |
| |
>3-5 acres - $600 |
| |
>5-15 acres - $800 |
| |
>15-25 acres - $1,000 |
| |
>25-50 acres - $1200 |
| |
>50 acres - $1400 |
|
| Right-of-Way Permit |
$60.00 per unit |
|
| Water Test Fee |
$100.00 per sample |
|
| Water Utility |
| After Hours Reactivation Charge |
$25.00 |
|
| Annual Cooling Tower / Irrigation Sub-Meter charge per meter |
$50.00 |
|
| Builders Water Deposit |
$50.00 |
|
| Bulk Water Sales / per 1,000 gal |
$4.15 |
|
| Discharge Sewer Rates (regardless of source) / per 1,000 gal |
$4.22 |
|
| Hydrant Meters |
|
| 3/4" meter |
$200 deposit, $2.50 per day + $3.53 per 1,000 gallons |
| 2" meter |
$500 deposit, $3.00 per day + $3.53 per 1,000 gallons |
|
| Infrastructure Repair |
manpower hours + 30% for benefits, cost of materials or purchase price and cost for vehicles or equipment used in the repair |
|
| Monthly Sewer Base Charge per Meter size (inches) |
|
| 5/8 |
$10.99 |
| 3/4 |
$10.99 |
| 1 |
$16.49 |
| 1 1/2 |
$16.94 |
| 2 |
$17.86 |
| 3 |
$19.23 |
| 4 |
$24.73 |
| 6 |
$32.97 |
| 8 |
$41.21 |
| 10 |
$50.37 |
|
| Monthly Water Base Charge per Meter size (inches) |
|
| 5/8 |
$7.63 |
| 3/4 |
$7.63 |
| 1 |
$8.56 |
| 1 1/2 |
$9.20 |
| 2 |
$11.55 |
| 3 |
$15.69 |
| 4 |
$34.24 |
| 6 |
$52.78 |
| 8 |
$78.46 |
| 10 |
$190.79 |
|
| Penalty Rate (water & sewer) outstanding balances |
5% |
|
| Plumbers Bond Deposit |
$375.00 |
|
| Reactivate Water Charge |
$15.00 |
|
| Sanitary Sewer Wye locates / per locate |
$108.88 |
|
| Service Activation Charge |
$10.00 |
|
| Service Connections beyond one call |
$43.48 |
|
| Service Rates (receiving water through permanent meters) |
|
| Commercial Rates / per 1,000 gal |
$3.85 |
| Residential Rates / per 1,000 gal |
|
| for the first 7,000 gal |
$3.27 |
| 7,000-15,000 gal |
$3.85 |
| over 15,000 gal |
$4.81 |
|
| Sewer Connection Fee / per drain opening |
$30.00 |
|
| Sewer Improvement Fee (Maybrook) / per drain opening |
$42.61 |
|
| Sewer Improvement Fee (Middle Big Creek) / per drain opening |
$33.48 |
|
| Shut-off Non-Payment Charge |
$10.00 |
|
| Water Tap Fees (Based on Meter Size) and Meter Set-up |
|
| 5/8" x 3/4" |
|
| Tap Charge |
$3,085.00 |
| Meter Set-up |
$308.97 |
| |
|
| 3/4" |
|
| Tap Charge |
$5,142.00 |
| Meter Set-up |
$329.84 |
| |
|
| 1" |
|
| Tap Charge |
$8,227.00 |
| Meter set-up |
$443.67 |
| |
|
| 1 1/2" |
|
| Displacement |
|
| Tap Charge |
$10,283.00 |
| Meter set-up |
$1,729.45 |
| |
|
| 2" |
|
| Displacement |
|
| Tap Charge |
$20,567.00 |
| Meter set-up |
$1,685.20 |
| Compound |
|
| Tap Charge |
$32,907.00 |
| Meter Set-up |
Quote |
| |
|
| 3" |
|
| Class I & II Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$71,983.00 |
| Meter set-up |
Quote |
| Compound |
|
| Tap Charge |
$65,813.00 |
| Meter Set-up |
Quote |
| |
|
| 4" |
|
| Class I Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$123,400.00 |
| Meter Set-up |
Quote |
| Class II Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$129,570.00 |
| Meter Set-up |
Quote |
| Compound |
|
| Tap Charge |
$102,833.00 |
| Meter Set-up |
Quote |
| |
|
| 6" |
|
| Class I Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$257,083.00 |
| Meter Set-up |
Quote |
| Class II Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$287,933.00 |
| Meter Set-up |
Quote |
| Compound |
|
| Tap Charge |
$205,667.00 |
| Meter Set-up |
Quote |
| |
|
| 8" |
|
| Class I Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$370,200.00 |
| Meter Set-up |
Quote |
| Class II Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$493,600.00 |
| Meter Set-up |
Quote |
| Compound |
|
| Tap Charge |
$329,067.00 |
| Meter Set-up |
Quote |
| |
|
| 10" |
|
| Class I Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$596,433.00 |
| Meter Set-up |
Quote |
| Class II Turbine (With Water Utilities Director Approval) |
|
| Tap Charge |
$781,533.00 |
| Meter Set-up |
Quote |
| Compound |
|
| Tap Charge |
$473,033.00 |
| Meter Set-up |
Quote |
| |
|
| |
|
|